$2.3 millionon record, all years (grant values can span several years)
$4.30per person in the province
36.1 yearsof work at the median full-time wage
| Source | Records | Value |
|---|---|---|
| Provincial contract award | 16 | $2.3 million |
| Public body | Level | Records | Value |
|---|---|---|---|
| Newfoundland and Labrador Hydro | Provincial | 13 | $2.1 million |
| Nalcor Energy | Provincial | 2 | $192,600 |
| Department of Environment and Climate Change | Provincial | 1 | $99,112 |
| Year | Value | |
|---|---|---|
| 2022 | $154,982 | |
| 2023 | $433,036 | |
| 2024 | $468,998 | |
| 2025 | $1.3 million |
Patterns
Awarded without competition
9Contracts given to one supplier without an open call for bids.
Same supplier, sole-sourced again and again
7A public body gave the same supplier three or more sole-source awards.
Emergency awards
1Contracts awarded under the emergency or urgency exception.
Priced just under a limit
1Amounts within 5% below an open-call limit.
A flag is a question, not a finding.
Largest records
- Cat Arm U3 Feasibility Study $461,201
- Diesel Plant Condition Assessment Economic Life Feasibility Study $331,244
- Knowledge Sharing of the NL Transmission System $250,000Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- Avalon CT Studies and Engineering Support $149,436
- Battery Energy Storage System Feasibility Study $139,624
- 2023 Vista Maintenance $122,100Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- Bay D'Espoir Surge Tank 1 Interior Refurbishment $119,886Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- MSO Public Safety Around Dams and Dam Emergency Response Plan, Menihek, NL $119,600
- Wind Integration Study. $115,000Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- Churchill Falls Optimization study $115,000Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- Technical Advisory Services - Wind And Wind Hydrogen $99,112Flagged: Priced just under a limit
- Cat Arm Powerhouse Rock Slope – Level II Condition Assessment $87,012
- Review historic inflows to Hydro's reservoirs for trends, repair inconsistencies, and model average annual energy production. $73,000Flagged: Awarded without competition
- HTGS Tank 1 Repair Engineering Services $69,350Flagged: Awarded without competition; Emergency awards
- FEED for #1 & #2 Floor Refurbishment, Holyrood Thermal Generating Station $53,586Flagged: Awarded without competition; Same supplier, sole-sourced again and again
- Penstock/Scroll Case. $39,982Flagged: Awarded without competition; Same supplier, sole-sourced again and again
Spot an error? Email corrections@nlledger.ca. What to send.