R.J.G Construction Limited

Basin Cleanup, Flatrock NL

A flag is a question, not a finding. It is not evidence that anything wrong happened.

CAD 487,732.33

Reported federal award notice value. This is a contract or award value, not the amount paid out.

Selected because the supplier reports an NL province or Canadian NL postal code; the source identifies national, multiple-region or other delivery; no NL share is reported.

This is the whole reported commitment or notice value, not the amount paid or an NL allocation.

Public body
Fisheries and Oceans
Award date
Aug. 28, 2023
Method
Competitive - Open bidding
Record type
Federal award notice

Receipt

notice cb-551-7391380 (bulk file line 4057)

Open the source

Latest reported award notice value; the date is the original award date. May overlap contract disclosures. Excluded from supplier commitment summaries; shown separately in source and body summaries.

Source location evidence

Location evidence reviewed.

Reported address: country: Canada; province: NL; city: St. John's; postal code: A1B 3N9.

How counted: latest notice amendment; may overlap contract disclosures. Start: 2023-08-28; end: 2023-10-31; reported: 2023-11-14. Amount: published value.

  • regionsOfDelivery-regionsLivraison-eng: *Canada *Newfoundland and Labrador source
Full source fields
title-titre-eng
Basin Cleanup, Flatrock NL
title-titre-fra
Nettoyage du basin, Flatrock, NF
referenceNumber-numeroReference
cb-551-7391380
amendmentNumber-numeroModification
000
solicitationNumber-numeroSollicitation
30004526
contractNumber-numeroContrat
4500052790
publicationDate-datePublication
2023-11-14
contractAwardDate-dateAttributionContrat
2023-08-28
amendmentDate-dateModification
2023-11-14
contractStartDate-contratDateDebut
2023-08-28
contractEndDate-dateFinContrat
2023-10-31
contractAmount-montantContrat
0.00
totalContractValue-valeurTotaleContrat
487732.33
contractCurrency-contratMonnaie
CAD
awardStatus-attributionStatut-eng
Expired
awardStatus-attributionStatut-fra
Expiré
instrumentType-typeInstrument-eng
instrumentType-typeInstrument-fra
amendmentType-typeModification-eng
amendmentType-typeModification-fra
gsin-nibs
gsinDescription-nibsDescription-eng
gsinDescription-nibsDescription-fra
unspsc
*72100000
unspscDescription-eng
*Building and facility maintenance and repair services
unspscDescription-fra
*Services de construction, maintenance et réparation de bâtiment et services complémentaires
procurementCategory-categorieApprovisionnement
*CNST
noticeType-avisType-eng
Request for Proposal
noticeType-avisType-fra
Demande de propositions
procurementMethod-methodeApprovisionnement-eng
Competitive - Open bidding
procurementMethod-methodeApprovisionnement-fra
Concurrentielle - Invitation ouverte à soumissionner
selectionCriteria-criteresSelection-eng
Lowest Price
selectionCriteria-criteresSelection-fra
Prix le plus bas
limitedTenderingReason-raisonAppelOffresLimite-eng
limitedTenderingReason-raisonAppelOffresLimite-fra
tradeAgreements-accordsCommerciaux-eng
*Canadian Free Trade Agreement (CFTA)
tradeAgreements-accordsCommerciaux-fra
*Accord de libre-échange canadien (ALEC)
regionsOfDelivery-regionsLivraison-eng
*Canada *Newfoundland and Labrador
regionsOfDelivery-regionsLivraison-fra
*Canada *Terre-Neuve-et-Labrador
supplierLegalName-nomLegalFournisseur-eng
R.J.G Construction Limited
supplierAddressLine-ligneAdresseFournisseur-eng
P.O Box 8421, STN A
supplierAddressCity-fournisseurAdresseVille-eng
St. John's
supplierAddressProvince-fournisseurAdresseProvince-eng
NL
supplierAddressPostalCode-fournisseurAdresseCodePostal
A1B 3N9
supplierAddressCountry-fournisseurAdressePays-eng
Canada
supplierLegalName-nomLegalFournisseur-fra
R.J.G Construction Limited
supplierAddressLine-ligneAdresseFournisseur-fra
P.O Box 8421, STN A
supplierAddressCity-fournisseurAdresseVille-fra
St. John's
supplierAddressProvince-fournisseurAdresseProvince-fra
NL
supplierAddressCountry-fournisseurAdressePays-fra
Canada
contractingEntityName-nomEntitContractante-eng
Fisheries and Oceans
contractingEntityName-nomEntitContractante-fra
Pêches et Océans Canada
endUserEntitiesName-nomEntitesUtilisateurFinal-eng
endUserEntitiesName-nomEntitesUtilisateurFinal-fra
awardDescription-descriptionAttribution-eng
The scope of work for this project is the provision of construction activities for the basin cleanup at Flatrock, NL, as is more specifically described below and in the Drawings and Specifications, subject to all terms and conditions of the Contract. In general, the work under this contract consists of, but will not necessarily be limited to, the following: .1 Dredging the existing basin down to -2.0m L.N.T. Note that large boulders and armour stone units are present in the dredge area and these boulders/armour units are to be removed. The boulders/armour units to be removed, may be as large as 15 tonnes in size. No dredging will be permitted from atop the existing wharf infrastructure. .2 Excavation and removal of all rock (less than 8 tonnes in size) from behind the existing seawall, down to the elevations shown on the drawings. All rock removed from behind the seawall is to be disposed of in the disposal area shown on the drawings. FAMILIARIZATION WITH SITE Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. The Contractor must perform and complete the Work by eight (8) weeks completion.
awardDescription-descriptionAttribution-fra
L’étendue des travaux dans le cadre de ce projet concerne l’exécution des tâches de construction nécessaires au nettoyage du bassin à Flatrock (T.-N.-L.), comme cela est décrit de manière plus précise ci-dessous ainsi que dans les dessins et le devis, dans le respect de toutes les conditions du contrat. En général, les travaux à effectuer aux termes du présent contrat comprennent ce qui suit, sans toutefois s’y limiter : .1 Dragage du bassin existant jusqu’à une profondeur de 2,0 m sous le niveau de la marée normale la plus basse. Veuillez noter que de gros rochers et des unités de pierre de carapace sont présents dans la zone de dragage et que ces rochers et unités de carapace doivent être retirés. Les rochers et unités de carapace devant être retirés peuvent peser jusqu’à 15 tonnes. Aucun dragage ne sera autorisé à partir de l’infrastructure du quai existant. .2 Excavation et enlèvement de toutes les roches (moins de 8 tonnes) derrière l’ouvrage longitudinal existant, jusqu’aux élévations indiquées sur les dessins. Toutes les roches retirées de derrière l’ouvrage longitudinal doivent être éliminées dans la zone d’élimination indiquée sur les dessins. FAMILIARISATION AVEC LE SITE Avant de soumissionner, on recommande aux entrepreneurs de visiter le site et les alentours, à leurs propres frais et au moment qui leur convient, afin d’examiner et de vérifier la forme, la nature et l’étendue des travaux, de décider des matériaux requis et des moyens d’accès au site, et d’examiner et de vérifier la gravité et l’incertitude des conditions météorologiques et l’exposition à ces conditions, les conditions du sol, et toute installation qui leur sera nécessaire. Les entrepreneurs doivent, de manière générale, obtenir tous les renseignements requis quant aux risques, aux éventualités et aux autres circonstances qui pourraient avoir une incidence sur leur soumission. Aucune indemnité ne sera prévue par la suite en raison d’une erreur ou de la négligence relativement à l’observation et à la détermination appropriées des conditions applicables. Avant de visiter le site, les entrepreneurs, les soumissionnaires ou leurs invités doivent examiner la section 01 35 29 – Exigences en matière de santé et de sécurité. Ils doivent prendre les mesures de sécurité nécessaires pour les visites des lieux, avant ou après l’acceptation des soumissions. L’entrepreneur doit réaliser et achever les travaux au plus tard le huit (8) semaines.

Spot an error? Say so in the box below, or email corrections@nlledger.ca. What to send.

Something missing, wrong or confusing?

Say so here. No account is needed, and no email program. Every note is read.

What people asked for, and what was done

What kind of note is it? Optional

The address of this page is sent with it, so there is no need to say where you were.

Notes are read by the people who run the site. They are never shown on it. Privacy