Floyd’s Construction Limited

Harbour Cleanup - Fischells & St. David’s, NL

A flag is a question, not a finding. It is not evidence that anything wrong happened.

CAD 869,500.00

Reported federal award notice value. This is a contract or award value, not the amount paid out.

Selected because the supplier reports an NL province or Canadian NL postal code; NL Ledger has not established the work, benefit or jurisdiction from this record; source fields are available below.

This is the whole reported commitment or notice value, not the amount paid or an NL allocation.

Award date
Aug. 31, 2022
Method
Competitive - Open bidding
Record type
Federal award notice

Receipt

notice PW-22-01001825-1007713 (bulk file line 8449)

Open the source

Latest reported award notice value; the date is the original award date. May overlap contract disclosures. Excluded from supplier commitment summaries; shown separately in source and body summaries.

Source location evidence

Location review incomplete.

Reported address: province: NL; city: Rocky Harbour; postal code: A0K 4N0.

How counted: latest notice amendment; may overlap contract disclosures. Start: not stated; end: not stated; reported: 2022-09-19. Amount: published value.

    Full source fields
    title-titre-eng
    Harbour Cleanup - Fischells & St. David’s, NL
    title-titre-fra
    Nettoyage du port – Fischells et St. David’s (T.-N.-L.)
    referenceNumber-numeroReference
    PW-22-01001825-1007713
    amendmentNumber-numeroModification
    000
    solicitationNumber-numeroSollicitation
    30003241
    contractNumber-numeroContrat
    4500031924
    publicationDate-datePublication
    2022-09-19
    contractAwardDate-dateAttributionContrat
    2022-08-31
    amendmentDate-dateModification
    contractStartDate-contratDateDebut
    contractEndDate-dateFinContrat
    contractAmount-montantContrat
    869500.00
    totalContractValue-valeurTotaleContrat
    contractCurrency-contratMonnaie
    CAD
    awardStatus-attributionStatut-eng
    Active
    awardStatus-attributionStatut-fra
    Actif
    instrumentType-typeInstrument-eng
    instrumentType-typeInstrument-fra
    amendmentType-typeModification-eng
    amendmentType-typeModification-fra
    gsin-nibs
    *5139A
    gsinDescription-nibsDescription-eng
    *Construction Services, Not Elsewhere Specified
    gsinDescription-nibsDescription-fra
    *Services de construction, non énumérés ailleurs
    unspsc
    unspscDescription-eng
    unspscDescription-fra
    procurementCategory-categorieApprovisionnement
    *CNST
    noticeType-avisType-eng
    noticeType-avisType-fra
    procurementMethod-methodeApprovisionnement-eng
    Competitive - Open bidding
    procurementMethod-methodeApprovisionnement-fra
    Concurrentielle - Invitation ouverte à soumissionner
    selectionCriteria-criteresSelection-eng
    selectionCriteria-criteresSelection-fra
    limitedTenderingReason-raisonAppelOffresLimite-eng
    limitedTenderingReason-raisonAppelOffresLimite-fra
    tradeAgreements-accordsCommerciaux-eng
    tradeAgreements-accordsCommerciaux-fra
    regionsOfDelivery-regionsLivraison-eng
    regionsOfDelivery-regionsLivraison-fra
    supplierLegalName-nomLegalFournisseur-eng
    Floyd’s Construction Limited
    supplierAddressLine-ligneAdresseFournisseur-eng
    16 West Link Road
    supplierAddressCity-fournisseurAdresseVille-eng
    Rocky Harbour
    supplierAddressProvince-fournisseurAdresseProvince-eng
    NL
    supplierAddressPostalCode-fournisseurAdresseCodePostal
    A0K 4N0
    supplierAddressCountry-fournisseurAdressePays-eng
    supplierLegalName-nomLegalFournisseur-fra
    Floyd’s Construction Limited
    supplierAddressLine-ligneAdresseFournisseur-fra
    16 West Link Road
    supplierAddressCity-fournisseurAdresseVille-fra
    Rocky Harbour
    supplierAddressProvince-fournisseurAdresseProvince-fra
    NL
    supplierAddressCountry-fournisseurAdressePays-fra
    contractingEntityName-nomEntitContractante-eng
    Fisheries and Oceans Canada
    contractingEntityName-nomEntitContractante-fra
    Pêches et Océans Canada
    endUserEntitiesName-nomEntitesUtilisateurFinal-eng
    Fisheries and Oceans Canada
    endUserEntitiesName-nomEntitesUtilisateurFinal-fra
    Pêches et Océans Canada
    awardDescription-descriptionAttribution-eng
    TWO PHASE SELECTION PROCESSThis is the first phase (Phase 1) of a two-phase competition: the first phase will evaluate the qualifications of all bidders; second phase (Phase 2) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Phase Two the pre-qualification list will be terminated, no additional contracts will be awarded. The work consists of the furnishing of all plant, labour, equipment and material for harbour cleanup at Fischells and St. David’s, NL, in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract. Note that the Contractor must incorporate COVID-19 standardized protocols in their site specific Health and Safety Plan. In general, work under this contract will consist of, but will not necessarily be limited to, the following:The dredging of class “B” material at St. David’s, NL. All dredge material at St. David’s is to be disposed at the location shown on the drawings.The removal of stockpiled fill material at Fischells, as noted on the drawings. Disposal of the stockpiled material at Fischells must be at the quarry shown on the drawings. The material must be stockpiled/placed at the quarry, by the Contractor, in a manner depicted on the drawings.Familiarization with siteBefore submitting a bid, it is recommended that bidders visit the site and its surroundings to review and verify the form, nature and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid or costs to do the work. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply.
    awardDescription-descriptionAttribution-fra
    PROCESSUS DE SÉLECTION EN DEUX PHASESVoici la première phase (phase 1) d’un concours à deux volets. La phase 1 évaluera les compétences de tous les soumissionnaires et la phase 2 invitera les soumissionnaires retenus à la phase 1 à transmettre une soumission financière pour le projet d’après les devis et les dessins. Une fois le contrat attribué au terme de la phase 2, la liste des soumissionnaires présélectionnés sera supprimée et aucun autre contrat ne sera attribué.Les travaux consistent à fournir la totalité des installations, de la main-d’œuvre, de l’équipement et des matériaux nécessaires au nettoyage du port de Fischells et St. David’s à Terre-Neuve-et-Labrador (T.-N.-L.), en respectant strictement le devis et les dessins qui l’accompagnent, ainsi que toutes les conditions du contrat. Il est à noter que l’entrepreneur contractant doit intégrer les protocoles normalisés relatifs à la COVID-19 dans son plan de santé et de sécurité propre au site. En général, les travaux à effectuer aux termes du présent contrat comprendront ce qui suit, sans nécessairement s’y limiter :Le dragage des matériaux de classe B à St. David’s, T.-N.-L. Les matériaux qui y sont récupérés doivent être jetés aux endroits indiqués dans les dessins;Le retrait des matériaux de remblayage empilés à Fischells, comme l’indiquent les dessins. L’élimination des matériaux empilés à Fischells doit se faire à la carrière comme l’indiquent les dessins. Les matériaux doivent être empilés et placés à la carrière, par l’entrepreneur, de la manière représentée dans les dessins.Familiarisation avec le siteAvant de présenter une soumission, les soumissionnaires sont invités à visiter les installations et leurs environs pour examiner et déterminer le type, la nature et l’étendue des travaux, les matériaux requis pour les exécuter, les moyens d’accès aux lieux, la rigueur des conditions météorologiques, leur caractère incertain et l’exposition à celles-ci, les conditions du sol et tout aménagement nécessaire. Ils doivent également obtenir tous les renseignements nécessaires en ce qui concerne les risques, les éventualités et autres circonstances pouvant influer sur leur soumission ou sur le coût d’exécution des travaux. Aucune allocation ne sera accordée ultérieurement en cas d’erreur ou d’omission relative à l’appréciation des conditions qui s’appliqueront sur le chantier. 

    Spot an error? Say so in the box below, or email corrections@nlledger.ca. What to send.

    Something missing, wrong or confusing?

    Say so here. No account is needed, and no email program. Every note is read.

    What people asked for, and what was done

    What kind of note is it? Optional

    The address of this page is sent with it, so there is no need to say where you were.

    Notes are read by the people who run the site. They are never shown on it. Privacy